超高層建筑空調水系統豎向分區研究
Research on vertical zoning of air conditioning water system in super high-rise buildings
摘要:
設備和管道系統的承壓能力是影響空調水系統豎向分區的主要因素。通過對國內外30余項規范標準及10多個廠商產品參數的調研,分析了空調系統主要設備、管道及連接方式的承壓能力;結合20個工程案例,對國內外在建和建成的典型超高層建筑空調水系統形式和豎向分區方法進行了歸類總結;基于理論與工程案例分析,得出了超高層建筑空調水系統豎向分區原則和不同高度超高層建筑水系統豎向分區方案。
Abstract:
The pressure bearing capacity of equipment and pipeline system is a main factor affecting vertical zoning of air conditioning water system. Based on the research of more than thirty standards at home and abroad, as well as parameters of various products from more than ten manufacturers, analyses the pressure bearing capacity of major equipments, pipes and connections of air conditioning systems. Combined with twenty projects, classifies and summarizes the forms of air conditioning water system and the methods of vertical zoning in typical super high-rise buildings in the construction and completion at home and abroad. According to analysis in theory and by project cases, obtains both the principles and the schemes of vertical zoning of air conditioning water system in super high-rise buildings with different heights.
Keywords:superhigh-risebuilding,airconditioningwatersystem,verticalzoning,pressurebearingofpipeline,pressurebearingofequipment